I wish to correct the misunderstandings in the letter by Tom Yam ("Incinerator’s hefty price tag defies guidelines and sense", July 3), the column by Howard Winn ("Incinerator proposal goes to LegCo for funding", July 4), and the letter by Louise Preston ("Unimpressed by top official’s concerns", Louise Preston, July 24).

On the siting of the Integrated Waste Management Facility (IWMF) Yam raised, we considered it important to achieve a more balanced distribution of waste facilities and more efficient interface with the refuse transfer network, hence the choice of an artificial island site near Shek Kwu Chau.

The IWMF near Shek Kwu Chau has already been approved under various ordinances. Going for another site now will not be quicker as it will take considerable time to get the necessary approvals.

Also, Tsang Tsui is already the site for the Sludge Treatment Facility recently built with a maximum capacity for incinerating 2000 tonnes of sludge per day.

Regarding the contractual model, Yam may be unaware that the Design-Build-Operate (DBO) model is a well-proven and cost-effective contractual model used in Hong Kong for all major waste facilities over the past 20 years. There is no reason to believe the DBO model would not work for the waste-to-energy plant.

Moreover, he wrongly used the money-of-the-day figure when calculating the unit capital cost of Hong Kong’s plant.

Based on the current price of about HK$12.7 billion, the unit capital cost of the IWMF is about HK$4.25 million per tonne and is comparable to that of the Dutch plant, even when the additional works, such as reclamation and other advanced facilities, are included.

The unit capital cost of the IWMF is also comparable to that of the new 1100 tonnes per day waste-to-energy plant being built at Amagar Bakke in Denmark with similar performance requirements, which is about HK$4.27 million per tonne.

The plasma gasification plants mentioned by Winn are relatively small in scale with very limited performance track record. Our recent visit with legislators to Europe in March this year has reaffirmed this observation.

It would take several years of operation before the effectiveness and efficacy of such gasification plants can be evaluated.

The modern 3000 tonnes per day IWMF will adopt proven, cost-effective technology that can reliably safeguard public health and meet the most stringent environmental standards on a par with other similar modern facilities in the world.